J&J Line Services Logo

J&J Line Services

Utility Construction

Helicopter transmission line work

Safety Program

Tailboard / Job Briefing Form

Complete this form before starting work. All submissions are sent directly to J&J Line Services leadership.

“No weapon formed against us shall prosper.” — Isaiah 54:17

Download printable PDF version

1 | Job Information
2 | Scope of Work — Describe Today's Tasks
3 | Hazards Identified
4 | PPE Required
5 | Minimum Approach Distances (MAD) — Reference Only
Voltage Range Restricted Approach Limited Approach
Up to 750V1 ft 0 in2 ft 2 in
751V – 15kV2 ft 2 in5 ft 3 in
15.1kV – 36kV2 ft 7 in6 ft 0 in
36.1kV – 46kV2 ft 9 in6 ft 0 in
46.1kV – 72.5kV3 ft 3 in6 ft 0 in
72.6kV – 121kV3 ft 9 in8 ft 0 in
6 | Equipment in Use
7 | Emergency Information
8 | Pre-Job Checklist
Item Yes No
1. All crew briefed on today's hazards?
2. PPE inspected and worn by all crew?
3. LOTO / Grounding plan discussed?
4. Minimum Approach Distances communicated?
5. Traffic control in place (if applicable)?
6. 811 / Locates confirmed on-site?
7. Equipment pre-trip inspections complete?
8. First aid kit confirmed in vehicle?
9. Emergency plan and muster point reviewed?
10. Stop Work Authority discussed with crew?
9 | Crew Acknowledgment

All crew members confirm they have been briefed on today's hazards, understand the scope of work, and are committed to working safely.

# Printed Name Role Time
1
2
3
4
5
Submission Details

The email address of the person submitting this form.

J&J Line Services | Powerline Tailboard / Job Briefing | Isaiah 54:17 | Veteran Owned